Skip to main content
Loading…
This section is included in your selections.

No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by this code for which a permit is required, until released by the building official.

The building official shall have the authority to authorize the temporary connection of the building or system to the utility source of energy, fuel, or power.

The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by this code and the codes referenced in case of emergency where necessary to eliminate an immediate hazard to life or property, or when such utility connection has been made without the required approval. The building official shall notify the serving utility, and wherever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing as soon as practical thereafter. (Ord. 2344 § 1 (Exh. A), 2021; Ord. 1986 § 1, 2007; Ord. 1926 § 4, 2004).