A. Erosion and Landslide Hazard Areas. Activities on sites containing erosion or landslide hazards shall meet the standards of BMC 14.04.870, Performance standards – General requirements, and the specific following requirements:

1. Buffer Requirement. A buffer shall be established from all edges of landslide hazard areas. The size of the buffer shall be determined by the director to eliminate or minimize the risk of property damage, death, or injury resulting from landslides caused in whole or part by the development, based upon review of and concurrence with a critical areas report prepared by a qualified professional.

a. Minimum Buffer. The minimum buffer shall be equal to the height of the slope or 50 feet, whichever is greater.

b. Buffer Reduction. The buffer may be reduced to a minimum of 10 feet when a qualified professional demonstrates to the director’s satisfaction that the reduction will adequately protect the proposed development, adjacent developments, and uses and the subject critical area.

c. Increased Buffer. The buffer may be increased where the director determines a larger buffer is necessary to prevent risk of damage to proposed and existing development;

2. Alterations. Alterations of an erosion or landslide hazard area and/or buffer may only occur for activities for which a hazards analysis is submitted and certifies that:

a. The development will not increase surface water discharge or sedimentation to adjacent properties beyond pre-development conditions;

b. The development will not decrease slope stability on adjacent properties; and

c. Such alterations will not adversely impact other critical areas;

3. Design Standards. Development within an erosion or landslide hazard area and/or buffer shall be designed to meet the following basic requirements unless it can be demonstrated that an alternative design that deviates from one or more of these standards provides greater long-term slope stability while meeting all other provisions of this chapter. The requirement for long-term slope stability shall exclude designs that require regular and periodic maintenance to maintain their level of function. The basic development design standards are:

a. The proposed development shall not decrease the factor of safety for landslide occurrences below the limits of 1.5 for static conditions and 1.2 for dynamic conditions. Analysis of dynamic conditions shall be based on a minimum horizontal acceleration as established by the current version of the International Building Code;

b. Structures and improvements shall minimize alterations to the natural contour of the slope, and foundations shall be tiered where possible to conform to existing topography;

c. Structures and improvements shall be located to preserve the most critical portion of the site and its natural landforms and vegetation;

d. The proposed development shall not result in greater risk or a need for increased buffers on neighboring properties;

e. The use of retaining walls that allow the maintenance of existing natural slope area is preferred over graded artificial slopes; and

f. Development shall be designed to minimize impervious lot coverage;

4. Vegetation Retention. Unless otherwise provided or as part of an approved alteration, removal of vegetation from an erosion or landslide hazard area or related buffer shall be prohibited;

5. Seasonal Restriction. Clearing shall be allowed only from May 1st to October 1st of each year; provided, that the city may extend or shorten the dry season on a case-by-case basis depending on actual weather conditions, except that timber harvest, not including brush clearing or stump removal, may be allowed pursuant to an approved forest practice permit issued by the city or the Washington State Department of Natural Resources;

6. Utility Lines and Pipes. Utility lines and pipes shall be permitted in erosion and landslide hazard areas only when the applicant demonstrates that no other practical alternative is available. The line or pipe shall be located above ground and properly anchored and/or designed so that it will continue to function in the event of an underlying slide. Storm water conveyance shall be allowed only through a high-density polyethylene pipe with fuse-welded joints, or similar product that is technically equal or superior;

7. Point Discharges. Point discharges from surface water facilities and roof drains onto or upstream from an erosion or landslide hazard area shall be prohibited except as follows:

a. Conveyed via continuous storm pipe downslope to a point where there are no erosion hazards areas downstream from the discharge;

b. Discharged at flow durations matching pre-developed conditions, with adequate energy dissipation, into existing channels that previously conveyed storm water runoff in the pre-developed state; or

c. Dispersed discharge upslope of the steep slope onto a low-gradient undisturbed buffer demonstrated to be adequate to infiltrate all surface and storm water runoff, and where it can be demonstrated that such discharge will not increase the saturation of the slope;

8. Subdivisions. The division of land in landslide hazard areas and associated buffers is subject to the following:

a. Land that is located wholly within a landslide hazard area or its buffer may not be subdivided. Land that is located partially within a landslide hazard area or its buffer may be divided; provided, that each resulting lot has sufficient buildable area outside of, and will not affect, the landslide hazard or its buffer;

b. Access roads and utilities may be permitted within the landslide hazard area and associated buffers if the city determines that no other feasible alternative exists; and

9. Prohibited Development. On-site sewage disposal systems, including drain fields, shall be prohibited within erosion and landslide hazard areas and related buffers.

B. Seismic Hazard Areas. Activities proposed to be located in seismic hazard areas shall meet the standards of BMC 14.04.870, Performance standards – General requirements.

C. Other Hazard Areas. Activities on sites containing or adjacent to other geologically hazardous areas, shall meet the standards of BMC 14.04.870, Performance standards – General requirements. (Ord. 1946 § 3, 2005).