Skip to main content
Loading…
This section is included in your selections.

A. The Build-To-Corner requirement specifies that buildings must “hold the corner” of the parcel at the intersection of two streets. The build-to-corner location is defined by the required front yard setback lines as shown in Figure 12.64.213 Build-To-Corner. This requirement shall be as specified in BMC 12.64.100 District Requirements.

B. Where the Build-To-Corner Building Placement is required, all corner parcels must meet this requirement by siting a building at its street corner.

Fig. 12.64.213. Build-to-Corner