Skip to main content
Loading…
This section is included in your selections.

A. In Subdistrict A, building setback requirements along public rights-of-way shall be 25 feet, except as otherwise provided in BMC 12.56.080(E). Such setbacks shall be landscaped in accordance with the landscaping standards of BMC 12.56.100.

B. The setback requirements from all other property lines in Subdistrict A which do not abut R zoning (not including combination zones) shall be 10 feet. The setback requirements from property lines which abut R zoning shall be as set forth in BMC 12.14.070(D), except as otherwise provided in BMC 12.56.080(E) for buildings higher than 35 feet.

C. In Subdistrict B, the setback requirements shall be governed by the standards of the zoning classification in which the development is located as set forth in Chapter 12.14 BMC, except as otherwise provided in BMC 12.56.080(E) for buildings higher than 35 feet, and in BMC 12.56.120(H) for properties zoned R-AC, OP, NB.

D. In Subdistrict A, when adjoining properties are developed simultaneously, setback requirements, except setbacks on public rights-of-way, may be waived. (Ord. 1946 § 2, 2005; Ord. 1876 § 2, 2002; Ord. 1815 § 1, 2000; Ord. 1629 § 1, 1996. Formerly 12.56.190).